This boiler was decommissioned in 2009. The facility's steam consumption decreased and a smaller unit was installed. Boiler is complete with all controls, instrumentation, Relief Valves, Stop Valves.
Note: Drawings, Manufacturer's Form P-2, P-6 Data Reports, and National Board Reports are available for unit. Unit is available for inspection and shipment from Williamsport, PA